Haulage & logistics · Knockmay, Portlaoise

Commercial solar for Aylward Heavy Haulage in Portlaoise

Aylward Heavy Haulage’s Portlaoise project shows a commercial solar installation without battery storage. The film and handover specification explain what was fitted, while keeping the needs of another logistics premises separate.

Open the Aylward Heavy Haulage film directly
DC panel capacity
40.05 kWp
Inverter configuration
25 kW Sigenergy
Project panels
89 × JA Solar 450W

The handover equipment schedule records the panels, inverter and absence of a battery. Annual generation is a design estimate, not a measured result.

A solar system with no battery

The installed system comprises 89 JA Solar 450W modules, totalling 40.05 kWp of DC panel capacity, with one 25 kW Sigenergy controller and Clenergy trapezoidal mounting. The handover schedule records no battery.

Generation estimate

The project design estimates 35.62 MWh of annual generation. This is a modelled figure, not a report of achieved output. It does not show the share of site demand met by solar or a financial saving.

Planning around a working depot

For logistics sites, access routes, busy periods and electrical shutdown constraints should be considered early. A site review should identify the practical requirements before an installation programme is agreed.

This page describes one project, not a package for another site. An enquiry starts a conversation. It does not confirm an appointment or commit you to an installation.